Jury, R. D., J. P. Hollings, and T. J. Catley. 1989. “Design of a Curved 414m Long Continuous Concrete Railway Bridge to Resist Earthquake Motions”. Bulletin of the New Zealand Society for Earthquake Engineering 22 (1): 50-56. https://doi.org/10.5459/bnzsee.22.1.50-56.