Jury, . R. D., Hollings, J. P. and Catley, T. J. (1989) “Design of a curved 414m long continuous concrete railway bridge to resist earthquake motions”, Bulletin of the New Zealand Society for Earthquake Engineering, 22(1), pp. 50–56. doi: 10.5459/bnzsee.22.1.50-56.