Jury, . R. D., J. P. Hollings, and T. J. Catley. “Design of a Curved 414m Long Continuous Concrete Railway Bridge to Resist Earthquake Motions”. Bulletin of the New Zealand Society for Earthquake Engineering, vol. 22, no. 1, Mar. 1989, pp. 50-56, doi:10.5459/bnzsee.22.1.50-56.