Jury, R. D., J. P. Hollings, and T. J. Catley. “Design of a Curved 414m Long Continuous Concrete Railway Bridge to Resist Earthquake Motions”. Bulletin of the New Zealand Society for Earthquake Engineering 22, no. 1 (March 31, 1989): 50–56. Accessed April 17, 2026. https://bulletin.nzsee.org.nz/article/view/787.