Engineering seismology
DOI:
https://doi.org/10.5459/bnzsee.2.1.24-26Abstract
The aftershock that occurred at 12:45 GMT on June 5 gave the first direct comparison of a 3-component time base accelerograph (M01) with the simpler scratch-plate horizontal accelerograph (SP 1) developed at Physics and Engineering Laboratory.
Downloads
Published
31-03-1969
How to Cite
Stephenson, W. R. (1969). Engineering seismology. Bulletin of the New Zealand Society for Earthquake Engineering, 2(1), 24–26. https://doi.org/10.5459/bnzsee.2.1.24-26